Two welders at work on the Mersey oil pipeline. The Mersey oil pipeline was installed in 1967 by Laing Civil Engineering in association with the French companies, Entrepose and Grands Trevaux de Marseille (GTM). It is 88 miles in length and runs from Ellesmere Port to the Kingsbury Oil Terminal serving the Midlands.
Pixel Dimensions (W x H) : 5245x5312
File Size : 27,209kb