The foundation tub for a 509 Revolver crane being lifted on to a gantry at Graythorp. In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication yard and dry dock on the site of the old William Gray Shipyard. The company created a dry dock which was used for the construction of fixed platform North Sea drilling rigs for the BP North Sea Oil Project. By 1972, one thousand men were working on site to build a tubular structure which would support a drilling rig in the North Sea destined for the Forties Oilfield. This photograph is part of a batch taken to show the foundation tub of a 509 Revolver crane being lifted on to a gantry.
World Europe United Kingdom England Hartlepool Hartlepool
Pixel Dimensions (W x H) : 5077x7593
File Size : 37,647kb