A worker carrying out an x-ray of the North Coates pipeline, checking for faults in the welding. The civil engineering work on the North Coates oil pipeline was carried out by Laing Pipelines along with French companies Entrepose and GTM. Over two miles of 36 inch diameter pipeline, encased in concrete, was later pulled out to sea in the Humber Estuary.
Pixel Dimensions (W x H) : 5422x5377
File Size : 28,471kb