A view of excavations being carried out on the route of the Birmingham to Preston Motorway (M6), showing a excavator loading a dump truck with excavated material. The work on the Birmingham to Preston Motorway (M6), between junctions J13 to J16 started in June 1960 and was carried out by John Laing Construction Ltd.
Pixel Dimensions (W x H) : 5315x5347
File Size : 27,754kb