Filton Airfield, South Gloucestershire, 30/04/1950. Rapid Concrete Breaking Co Ltd trucks at Filton Airfield during construction of a runway, with construction work in progress beyond. Laing extended the runway westwards at Filton Airfield to accommodate the Bristol Brabazon airliner, which was being built at the airfield. Work began in July 1946 on the new runway, which was 2,725 yards long and 100 yards wide. The work required the requisitioning and removal of Charlton village and a temporary flying strip was laid, for use while the new runway was under construction.
Pixel Dimensions (W x H) : 7590x5459
File Size : 40,463kb