Vintners Place, Upper Thames Street, Queenhithe, London, 30/04/1991. A view of the basement excavations below the transfer deck at Vintners Place showing the large diameter piles supporting the steel frame of the superstructure. Laing undertook the £79m management contract for the construction of a 37,000sqm high quality office development at Vintners Place between March 1989 and December 1992. Work on site began in June 1989 with the demolition of 10 buildings including Vintry House and Kennet Wharf on the riverside. The listed façade of Thames House along Queen Street Place was preserved and incorporated into the development. The project was the first within the City of London in modern times permitted to reclaim land from the Thames foreshore for its riverside facade. 319 secant piles were bored for the perimeter foundation wall with 90 large diameter under-reamed piles for the main foundations and 84 contiguous piles within the coffer dam.
World Europe United Kingdom England Greater London London City of London
Pixel Dimensions (W x H) : 4723x4739
File Size : 21,858kb